Showing posts with label socks. Show all posts
Showing posts with label socks. Show all posts

11 May 2011

May? Already?

I hadn't realised how badly out of date this was... The vast amount of sewing got in the way.

So all 3 small frocks finished, 2 out of 3 dressing gowns finished, 1 large frock finished, an apron and a gollar also done.


Still on the sewing to do list - 1 dressing gown, 1 winter work skirt, 1 summer top, more frocks etc...

The socks have been moving along, as they are small and portable, up to turning the heel on the second sock. I don't really like the heel structure in this pattern and I think I'll go back to the old version for any new sock projects.

The cotton summer top didn't get finished for summer, the green throw rug has recently been dragged out again for warm knitting in front of the TV and a small amount has been added to the length of the purple scarf. Some of the ongoing projects must be finished before I start anything new - though I really would like to start another beret.

30 December 2009

Leaf green socks

Here's a piccie:

Completed and given away!

The next knitting project has started - a blah blah secret plan at this point but travelling along nicely.

The sundress got finished and another frock started... a few more to come.

The next large knitting project got deicded upon - Classic Wavy Cable from Jo Sharp using some of the lovely desert aran cotton. Must finish the blah blah secret plan first.

More stash has been purchased. Ozeyarn were closing down and so everything was so very on special that it could not be resisted. Some cotton, sock wool and the Knit 3 & 4 Jo Sharp books...

24 September 2008

Another pair o socks - nearly as addictive as scarves

Started on another pair of socks, making them up as I go along (somewhat) with some general guidance from a couple of patterns... The wool is Heirloom Jigsaw - it's self striping and looking very cute so far. I also finally bought the Socks, socks, socks book that I have been borrowing from the library every chance I get.

Still have a number of projects on the go - haven't done any work on the 2 pink scarves for a while now - need to get moving on those. The baby jacket in Jacaranda Biggan wool is coming along. I really like the selvedge detail on it - I may use that in plans to come.

Have sketched out some ideas for jackets & things to use up some of the stash, but haven't got the necessary headspace at the moment to take it any further than that.

07 September 2008

Snuggy warm socks


All done! And the "ladderation" issue has improved due to much internet advice searching... One excellent site that I stumbled arcoss was Techknitting - linked in the sidebar. It seems to have solved the main problem. I was pulling on the first stitch after the needle changeover, now I'm waiting for the second stitch before the pull - and hey presto - much less ladderation (though still a bit of a line). If I could be bothered blocking bedsocks, I reckon even the line would fade out a bit.


More plans afoot...

04 August 2008

Pair'o'socks and sunbeams

I have managed the other sock & the pair are now done - hoorah! Knitting with such weeny needles in the round does hurt my fingers after a while, so any socks in future are going to be on bigger needles. I have bought some yummy fuzzy Caressa in the same colours as the PJ's I made for myself - they will be the next socks when I find a suitable pattern.

The basketweave scarf is also complete! And I've finished all of the knitting for the lacy cardigan. Need to sew it all together now.


Also complete is the 3rd pinwale cord skirt and the niece's flanny cot sheets. Most of the mending is up to date as well - including hemming of work pants & jeans...

The two pink scarves are coming along, no work's been done on the green blankie. I spent some time this morning planning the next lot of knitting in a very sketchy sort of way. I need to have a closer look at what I should do next in the garment arena.

22 July 2008

That eureka moment!

I borrowed a fantastic book from the local library called Socks, Socks, Socks (edited by Elaine Rowley ISBN: 0-9646391-5-7). It has the best instructions on how to work a sock that I have ever seen as well as lots of gorgeous socks for inspiration. And then I picked up the teeny bedsocks that I started in about 2002 and managed to finish one of them without it looking like a mutant cross between a golf club cover and a cat's chew toy! Hoorah!!

Here's the sock:

Now I have the other one to do... but I am inspired - I managed to turn a heel properly and graft the ends. The bedsocks on the to-do list don't look nearly so daunting now.

I also finished the pink fingerless mitts - both of them done & sewn in less than a day.




Pink scarf 2 is coming along - it's about 25cm long now, the lacy trim is also coming along, probably about 1m so far. Not much else off the to-do list as yet...