Showing posts with label frocks. Show all posts
Showing posts with label frocks. Show all posts

11 May 2011

May? Already?

I hadn't realised how badly out of date this was... The vast amount of sewing got in the way.

So all 3 small frocks finished, 2 out of 3 dressing gowns finished, 1 large frock finished, an apron and a gollar also done.


Still on the sewing to do list - 1 dressing gown, 1 winter work skirt, 1 summer top, more frocks etc...

The socks have been moving along, as they are small and portable, up to turning the heel on the second sock. I don't really like the heel structure in this pattern and I think I'll go back to the old version for any new sock projects.

The cotton summer top didn't get finished for summer, the green throw rug has recently been dragged out again for warm knitting in front of the TV and a small amount has been added to the length of the purple scarf. Some of the ongoing projects must be finished before I start anything new - though I really would like to start another beret.

22 January 2010

Sewing and more sewing

Here's a piccie of the finished sundress:


And lots more sewing has been happening... There is now finished:
Italian Ren-based SCA frock out of red brocade (with small embellishment and pin-in-able sleeves)
chemise to go with frock
another sundress - polka dots
finishing a pair of SCA trews (that I found along the way, that I obviously didn't quite finish years ago)
some mending

Several new patterns have been cut out, one top for me is cut out ready to sew.

Have so many plans - SCA, home stuff, more clothes... now need time to make it happen.

The critical list is:
another SCA frock - Italian Ren - green brocade
finishing the last 2 frocks and the German Ren hat that got put away years ago. The main construction on the frocks is done - need to add the decoration. Need to figure out where the hat is up to.
a couple more chemises and caps
a pouch
a belt
Hemming a couple of table cloths
Finishing the top that is cut out
taking a pattern from my fave denim skirt that really is going to die soon and making a new one
finishing the quilt I started 8 years ago

On the knitting front, the back of the blah, blah secret plan is finished, have started on the front.

I have also done stage 1 of sewing room reorganisation (which means at least that the knitting needles are no longer in a pile on the floor). Stage 2 requires stash reduction or at least a more cunning plan for storage space use.